TSCM401U08L01

Parallel SequenceCan create for routings and rate routings An alignment key defines the start of the individual parallel sequences […]

Read More →

TSCM401U07L06

BOM Mass ChangeChanging the component quantityChanging the item dataAdd an itemReplacing an itemDeleting an item Product StructureMaterialBOMDocumentRouting

Read More →

TSCM401U07L05

Variant BOMSimilar products with different combinations of components Plant and BOM usage are part of the unique key that […]

Read More →

TSCM401U07L04

Multiple BOMSame product with different combinations of components Plant and usage are part of the unique key that identifies […]

Read More →

TSCM401U07L03

Simple DiscontinuationMaterial master > MRP 4 > Discontinuation indicator = 1 – Single/parallel discontinued part/materialMaterial master > MRP 4 […]

Read More →

TSCM401U07L02

Phantom AssemblyMaterial master MRP 2 special procurement = 50 – Phantom assemblyThis ensures that this part at plant level […]

Read More →

TSCM401U07L01

Co-ProductMain product material master > MRP 2 > Co-product = checkedCo-product material master > MRP 2 > Co-product = […]

Read More →

TSCM401U06L04

Engineering Change ManagementMonitoring and documenting changesPlanning and executing changes at a specific point in timeSaving multiple change statuses for […]

Read More →

TSCM401U06L03

SuboperationsScheduling at operation levelCapacity planning at suboperation levelCosting at suboperation levelCumulate standard values from suboperations in the corresponding operationDetermine […]

Read More →

TSCM401U06L02

Routing Material Assignment1) Create the routing for a specific material2) Use the material assignment function in the routing header […]

Read More →