SAP PP – Material Master

Creation
Direct
Copy from
MRP Profile
MRP Group

Industry sector

Material Type
SPRO > Logistic – General

Classification
MRP 1 (plant/storage location) no difference in view between plant and storage location
MRP 2 (plant/storage location) no difference in view between plant and storage location
MRP 3 (plant/storage location) no difference in view between plant and storage location
MRP 4 (plant/storage location) get storage location level screenshot
Work Scheduling (plant)
Accounting 1 (plant/valuation type)
Accounting 2 (plant/valuation type)
Costing 1 (plant)
Costing 2 (plant)
Plant stock (plant)

Basic data 1
Base Unit of Measure
Material Group
X-plant material status

MRP 1
MRP group
Purchasing Group
ABC Indicator
Plant-s.matl status
MRP Type
Planning time fence
MRP Controller
Lot size
Minimum Lot Size
Maximum Lot Size
Maximum stock level
Assembly scrap (%)
Takt time
Rounding Profile
Unit of Measure Grp
MRP area exists

MRP 2
Procurement type
Special procurement
1) 50 – Phantom assembly
2) 52 – Direct production / collective order
Prod. stor. location
Quota arr. usage
Default supply area
Backflush
Storage loc. for EP
Stock det. grp
Co-product
Bulk material
In-house production
Planned Deliv. Time
GR processing time
Planning calendar
SchedMargin key
Safety Stock
Min safety stock
Coverage profile
Safety time ind.
STime period profile

MRP 3
Strategy group
Consumption mode
Bad consumption per.
Fwd consumption per.
Mixed MRP
Planning plant
Availability check

MRP 4
Selection method
Component scrap (%)
Individual/coll.
Repetitive mfg
REM profile
SLoc MRP indicator

Work scheduling
Unit of issue (default for BOM components)
Production unit
Prodn Supervisor
Prod.Sched.Profile
Overall profile
Batch Mgmt Rqt
Setup Time
Interoperation
Processing Time
Base quantity
InhseProdTime

Accounting 1
Valuation Class
Price Control
Price Unit

Tables
MARA
MARC
MARD